Facility Design STREAM
-
Safety Department At Cleanroom Manufacturer Ensures No One Gets Hurt
1/7/2020
AES takes the well-being and safety of all of our team members very seriously. In this video, AES director of EHS Tony Mangabat highlights some of the measures our safety department takes to ensure no one gets hurt at AES.
-
Modular Cleanroom Overview
7/14/2023
Gain insight into AES' projects and experience in cleanroom design innovation, manufacturing, and construction. In this overview, Avid Bioservices, INCOG BioPharma, Theragent, and Charles River share the value of partnering with AES.
-
AES Compass™ Cleanroom Facility Programming Video
3/8/2021
AES Compass is a conceptual planning program that helps you identify the critical parameters of your cleanroom project ahead of the design process, ensuring that your facility will be completed on-time and on-budget with minimal delays and disruptions.
-
The Facility Of The Future
5/19/2020
The facility of the future requires evolution in many disciplines by combining advanced bioprocessing and digital technologies under one roof. Welcome to bioprocessing 4.0.
-
Addressing Rapid Biomanufacturing Capacity Needs
10/21/2022
Adapt to evolving biomanufacturing demands and rapid capacity needs with a KUBio™ box environment, KUBio™ modular facility and integrated FlexFactory™ configurable manufacturing train.
-
Flexible Manufacturing: Better, Faster Virus Production
11/7/2019
The global vaccine market is growing due to population growth, emerging pathogens and pandemics. The increased demand has led to new vaccines, manufacturing facility projects and increasing investments. Using flexible manufacturing strategies can help meet this growing vaccine demand.
-
Key Factors When Selecting A Modular Cleanroom For Drug Manufacturing
8/24/2022
See the modular aseptic cleanroom basics and what building blocks are needed to get the end result you are looking for.
-
Cleanroom Manufacturer Expands Capacity To Meet Industry Needs
12/12/2019
AES Clean Technology builds more cleanrooms than anyone else. The market is busy, and so are we... but are we too busy? The answer is a resounding "NO, AES is not too busy!" We plan our cleanroom design, panel manufacturing, and manpower loading and scale as needed. We currently have the capacity to more than double our panel manufacturing.
-
Time And Cost Savings Of Modular Cleanrooms Vs. Stick Built Cleanrooms
6/30/2021
While using drywall may seem like it can save you money on your cleanroom project at first glance, you can save money over the life cycle of your cleanroom with modular construction.
-
How To Best Optimize mRNA Production Workflows
4/11/2023
Multiple steps in the mRNA manufacturing process can appear more complex than they have to be. Learn how to simplify your approach and produce the best possible mRNA vaccines and therapeutics.