Facility Design Solutions
-
Pharmaceutical Clean Room Wall System Accessories
8/10/2020
Your next drug manufacturing cleanroom is more akin to a piece of equipment than a room. Operational efficiencies, compliant flow of materials and personnel, and lifecycle considerations should dictate the selection of your cleanroom partner. AES designers have been engineering functional cleanroom facilities for over three decades, guaranteeing the performance of each and every facility. Our in-house designers work as a team with our cleanroom construction personnel to engineer a cost-effective project while maximizing performance, value, and constructability. The greatest value is realized when AES is integrated into the design team at the start of the project. Early project integration with the AES experts helps the infrastructure team decide what support and cleanroom solutions the clean space requires. Early participation by AES saves design costs, expedites schedule, and eliminates a duplication of services.
-
Pharmaceutical Cleanroom Flooring
8/10/2020
Floor to Wall Integration at Airwall Corridor.
-
Pharmaceutical Cleanroom Doors
8/10/2020
AES Clean Technology offers a variety of specialty cleanroom doors for use throughout your cleanroom facility. Sliding doors are available as manual or automatic. Single or bi-parting sliding doors are offered as FRP, fiberglass or stainless steel, with a variety of hardware and door frame options in sizes up to 8' x 8' for manual doors and 10' x 10' for powered doors.
-
Pharmaceutical Cleanroom Laminar Flow Equipment
8/10/2020
Vertical or Horizontal Modules can be joined to form large zones of critical clean airflow within a larger cleanroom.
-
AES Profile Pharmaceutical Cleanroom System
7/16/2020
The AES Profile cleanroom system is another AES hallmark system, a 2” [50mm] thick modular wall system with a uPVC finish, with all seams cold welded together to create a monolithic finish. The reduced wall cross section with all flush finishes at doors and windows provides a superior performing system.
-
Rapid Design-Build Cleanroom Solutions: AES Fast-Lane Program
7/4/2020
Speed-to-market is the number one driver in the pharma/bio industry today ... the faster our clients can build facilities, the quicker they can get treatments into the hands of the patients who need them the most. The AES Fast Lane program is an accelerated Design, Manufacture, and Installation program that fast tracks your cleanroom facility project in seven months.
-
AES Omni Brochure
4/15/2020
AES Omni integrates up to six gas supplies into the vertical posts of the AES modular cleanroom system.
-
Cleanroom Facility Integrated Process Utility Raceway: AES Omni
4/15/2020
AES Omni integrates up to six gas supplies into the vertical posts of the AES modular cleanroom system.
-
Modular Pharmaceutical Cleanrooms
3/27/2020
AES Clean Technology provides complete pharmaceutical modular cleanroom project delivery with guaranteed performance. Our integrated products + solutions offering provides risk mitigation with single-source responsibility.
-
Securing Data Integrity With Airborne Particle Counters
3/3/2020
Ensure complete, consistent, and accurate data according to ALCOA+ principles with TSI AeroTrak® Portable APCs.