Project Management Considerations For Pharmaceutical Wastewater Systems

Source: CAI
Construction Engineer GettyImages-850817850

The wastewater from a client's pharmaceutical facility was changed to discharge to a city-forced main instead of the existing gravity main. Installation of the new forced line was requested by the city to manage the increased discharge of wastewater from the pharmaceutical manufacturing site in Florida, USA.

CAI was the principal consultant for the overall project management effort and represented the owner during negotiations with the city. This included management of operational readiness activities at all phases of the project; conceptual, capital request, design, permits, construction, test, closeout, and turnover to the city. As part of the scope, segregation of sanitary and process wastewater from the existing facility and installation of three new lift stations were needed to fulfill both city and owner requirements. Learn about this project in greater detail and how CAI supported all steps of Installation/Operation Verification (IOV) while leading the overall project management effort.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Bioprocess Online? Subscribe today.

Subscribe to Bioprocess Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Bioprocess Online